Review The newly opened 4billion World Trade Center transit hub is overwrought and

Video Early last month, Santiago Calatrava's World Trade Center Transportation Hub in New York finally made its public debut. But after more than a decade of construction, little fanfare marked the milestone for the much-delayed, nearly $4 billion project, which was originally slated to open in 2009 and was first estimated to cost $2.2 billion.. The Oculus was positioned as part of the World Trade Center masterplan by Daniel Libeskind and designed by Santiago Calatrava. The structure's white metal-clad steel ribs reach up and out in a monumental move symbolic of a hand releasing a dove. The structure's orientation serves as a lasting reminder of the attacks of September 11, 2001.


Inside the Oculus World Trade Center transportation hub opens in pictures US news The

Inside the Oculus World Trade Center transportation hub opens in pictures US news The


World Trade Center Transportation Hub To Open In March, Financial District New York YIMBY

World Trade Center Transportation Hub To Open In March, Financial District New York YIMBY


World Trade Center Transportation Hub FISHER MARANTZ STONE

World Trade Center Transportation Hub FISHER MARANTZ STONE


World Trade Center Transportation Hub by Santiago Calatrava 20160401 Architectural Record

World Trade Center Transportation Hub by Santiago Calatrava 20160401 Architectural Record


At Last, Tour Santiago Calatrava's World Trade Center Transportation Hub Curbed NY

At Last, Tour Santiago Calatrava's World Trade Center Transportation Hub Curbed NY


Why The World Trade Center Transportation Hub Is Going To Cost 4 Billion Business Insider

Why The World Trade Center Transportation Hub Is Going To Cost 4 Billion Business Insider


World Trade Center's Oculus 4 billion new World Trade Center transit hub Pictures CBS News

World Trade Center's Oculus 4 billion new World Trade Center transit hub Pictures CBS News


Galeria de World Trade Center Transportation Hub / Santiago Calatrava 21

Galeria de World Trade Center Transportation Hub / Santiago Calatrava 21


Longawaited 4 billion World Trade Center transit hub to open quietly Crain's New York Business

Longawaited 4 billion World Trade Center transit hub to open quietly Crain's New York Business


Complex Design, Political Fights Send World Trade Center Rail Hub's Cost Soaring WSJ

Complex Design, Political Fights Send World Trade Center Rail Hub's Cost Soaring WSJ


World Trade Center Transportation Hub by Santiago Calatrava 20160401 Architectural Record

World Trade Center Transportation Hub by Santiago Calatrava 20160401 Architectural Record


Galeria de World Trade Center Transportation Hub / Santiago Calatrava 6

Galeria de World Trade Center Transportation Hub / Santiago Calatrava 6


The New World Trade Center Transportation Hub Puts Dazzle Over Details WSJ

The New World Trade Center Transportation Hub Puts Dazzle Over Details WSJ


Galeria de World Trade Center Transportation Hub / Santiago Calatrava 27

Galeria de World Trade Center Transportation Hub / Santiago Calatrava 27


World Trade Center Transportation Hub Chicago Tribune

World Trade Center Transportation Hub Chicago Tribune


How Cost of Train Station at World Trade Center Swelled to 4 Billion The New York Times

How Cost of Train Station at World Trade Center Swelled to 4 Billion The New York Times


The new World Trade Center Transportation Hub Business Insider

The new World Trade Center Transportation Hub Business Insider


Watch TimeLapse of World Trade Center Transportation Hub’s Construction New York YIMBY

Watch TimeLapse of World Trade Center Transportation Hub’s Construction New York YIMBY


At Trade Center Transit Hub, Vision Gives Way to Reality The New York Times

At Trade Center Transit Hub, Vision Gives Way to Reality The New York Times


Inside the Oculus World Trade Center transportation hub opens in pictures US news The

Inside the Oculus World Trade Center transportation hub opens in pictures US news The

The World Trade Center Transportation Hub, designed by Santiago Calatrava, was supposed to be a diaphanous structure that would be finished in 2009 at a cost of $2 billion.. March 2, 2016. For a dozen years, the World Trade Center Transportation Hub was a train wreck. Santiago Calatrava's winged dove, beefed up to meet security demands, devolved into a dino carcass.